Half Warm mixture of different aggregates (stones, gravel and sand), dust, AC (Asphalt Cement) / bitumen and additives, at a temperature between 175ºF and 230ºF (80ºC and 110ºC), used for road construction and other urban elements. Produced in asphalt plants belonging to either medium or large construction companies.